Farrand Residence Hall Renovation
Project Overview
| Anticipated construction start: | June 2026 |
| Anticipated occupancy: | June 2028 |
| Budget: | $103.4 million |
| Assignable square footage: | 140,482 |
°Ç¸ç³Ô¹Ï the Project
CU °Ç¸ç³Ô¹Ï is proposing to complete a comprehensive renovation to the circa 1948 Farrand Residence Hall at 2200 Baker Drive on the Main Campus. The seven-story structure, constructed of sandstone and concrete with clay tile roofing, was the first residence hall built on the campus after WWII.
Upon completion, the project will house between 380 to 385 students. Two centrally scheduled classrooms, grab and go market, and study space in the building will support the entire campus student body