Farrand Residence Hall Renovation

Oct. 27, 2026: Coming soon

May 2026 - August 2028: The renovation of Farrand Residence Hall is underway and will continue through summer 2028. Expect ongoing construction activity around the site, including regular contractor deliveries, material staging and equipment moving in and out of the area.

Wardenburg Drive will stay closed to through traffic until August 2028. Access remains limited on Baker Drive north of Farrand Hall, and the road just west of Farrand Hall is closed to public access. The four ADA parking spaces formerly on Baker Drive remain relocated to the parking lot north of Farrand Field.

Delivery vehicles and construction equipment may be present on surrounding roads and walkways, especially during weekday work hours. Pedestrians, cyclists and drivers should watch for flaggers, follow posted signage and detours, and allow extra time when traveling through the area. Libby and Aden Halls remain accessible.

For questions or coordination needs, such as deliveries, events, access or move-in/move-out near the site, please contact Housing & Facilities Services at david.benjes@colorado.edu.

Thank you for your patience as we improve this campus residential space.

Farrand Residence Hall Renovation - October 2026

Project Overview

Anticipated construction start:June 2026
Anticipated occupancy:June 2028
Budget:$103.4 million
Assignable square footage:140,482

°Ç¸ç³Ô¹Ï the Project

CU °Ç¸ç³Ô¹Ï is proposing to complete a comprehensive renovation to the circa 1948 Farrand Residence Hall at 2200 Baker Drive on the Main Campus. The seven-story structure, constructed of sandstone and concrete with clay tile roofing, was the first residence hall built on the campus after WWII.

Upon completion, the project will house between 380 to 385 students. Two centrally scheduled classrooms, grab and go market, and study space in the building will support the entire campus student body